This is being shared on behalf of Middlesex County.

Middlesex County is hosting a Public Information Centre (PIC) regarding the construction of a roundabout at the intersection of Glendon Dr, Vanneck Rd, Coldstream Rd and Jeffries Rd, and the realignment of Coldstream Rd (see map in the attached document below).

The purpose of the PIC is to present the road improvement design details, construction timing and impacts, staging and detours, along with environmental considerations. Public input will be obtained on the plan and anyone with an interest in the study is invited to attend and participate.

  • Date: Tuesday, May 10, 2022
  • Time: Drop-in between 5:30 – 7:30 p.m.
  • LocationKomoka Wellness Centre, 1 Tunks Lane, Komoka ON

If you are unable to attend the PIC and would like to provide comments, please forward them by Thursday, June 2, 2022 to either of the following project team members:

  • Chris Traini, P.Eng., Project Engineer, County of Middlesex, ctraini@middlesex.ca, 519-434-7321 ext. 2347
  • Isaac Bartlett, P.Eng., Project Manager, Stantec Consulting Ltd., isaac.bartlett@stantec.com, 519-675-6643

Additional information on the project is available at https://www.middlesex.ca/, including the Environmental Study Report summarizing the Municipal Class Environmental Assessment process completed in 2018.