Notice of Study Commencement - Expansion of the Komoka Wastewater Treatment Facility

Date

The Study

The Municipality of Middlesex Centre is completing a Schedule C Municipal Class Environmental Assessment Study for the expansion of the Komoka Wastewater Treatment Facility. This study is being conducted in compliance with the Municipal Class Environmental Assessment process (February 2024), which is approved under the Ontario Environmental Assessment Act.

The Middlesex Centre Servicing Master Plan (SMP) identified the need for the expansion to the Komoka Wastewater Treatment Facility to accommodate projected growth in Komoka/Kilworth. Specifically, the SMP recommended increased sanitary servicing through the construction of a sanitary collection and pumping system which discharges to the Komoka Wastewater Treatment Facility.

The project will examine:

  • Treatment capacity and performance;
  • Site layout to identify any topographic constraints, retaining walls and impacts on natural heritage features;
  • Alternative designs for outfall capacity; and
  • Staging of works to minimize disruption to current operations and to facilitate future phasing.

We Want to Hear From You!

The Municipality encourages the public to participate in the study process and learn more about the study by:

  • Signing up to the email contact list to receive project notices and updates (email Jeff Paul, project lead for Stantec Consulting, at jeff.paul@stantec.com).
  • Visiting the project website for more information: www.middlesexcentre.ca/komoka-wastewater.
  • Attending the Public Information Centre (PIC) during the study to review information and provide feedback to the project team on the problems and opportunities, potential options, decision-making process, recommended solutions, and next steps. More information on the PIC will be provided later in the study.

Should you require further information regarding this project or would like to provide comments, please feel free to contact us at the information listed below.

Project Leads

Jeff Paul, P. Eng., Consulting Engineer
Stantec Consulting Ltd.
400-1305 Riverbend Road, London, Ontario, N6K 0J5
(519) 675-6604
jeff.paul@stantec.com

Eric Joudrey, Environmental Services Manager (Project Manager)
Municipality of Middlesex Centre
10227 Ilderton Road, Ilderton, Ontario, N0M 2A0
(519) 666-0190 ext. 5255
joudrey@middlesexcentre.ca

 

All information is collected in accordance with the Environmental Assessment Act, RSO 1990 Chapter E.18 Part II.3 Section 17.3. Information will be used to inform the project team in the development of the Environmental Assessment. All submissions become part of the public record and disclosed in full in accordance with the Municipal Freedom of Information and Protection of Privacy Act (MFIPPA). 