Vanneck Road Reconstruction 2022

Date
Image
Road Closed Ahead Sign

This project is now completed.

 

Middlesex Centre will be reconstructing Vanneck Road from Sinclair Drive to Medway Road this summer.

Project Details

Location:

  • Vanneck Road from Sinclair Drive to Medway Road

Schedule:

  • Tentative start date – June 29, 2022
  • Estimated completion – August 26, 2022
  • Dates may change due to weather, supply chain issues and contractor availability.

Scope:

  • Reconstruction of the existing road Includes; tree trimming and removal (if required), ditching, culvert replacement, granular base and sub-base regrading & compaction, road platform widening, new asphalt surface, and pavement markings. 

Contractor:

  • Municipality of Middlesex Centre & asphalt contractor

How will Construction Impact You?

If you live or travel along the streets being resurfaced, please note:

  • Street Access and Parking:  Vanneck Road will be closed during construction only allowing local traffic to access their properties. A detour route will be in effect during construction with the appropriate signage to direct traffic.  
  • Vibration & Dust– Protect Valuables:  Construction equipment can cause vibrations and dust.  Please ensure you protect any valuables susceptible to damage, staff will monitor dust conditions and apply dust suppressants as required to minimize dust due to construction.
  • Mail Services:  Canada Post will continue to deliver mail during construction. Canada Post will provide further notification and instructions for residents that may be impacted. Staff will provide temporary mailboxes that are temporarily removed or impacted due to construction
  • Garbage and Recycling Collection:  If your pick-up point is temporarily blocked by construction the municipality will assist in collecting and transporting your garbage and recycling.  
  • Manicured Lawns:  The municipality will restore all damaged manicured lawns resulting from the construction project.  A mixture of seed and water will be applied by the municipality to such affected locations.  We encourage you to assist in the watering process.  

Questions?

If you have questions or concerns about this project, please contact Andrew Giesen, Transportation Manager.